| PHASES OF THE ORIGINAL LOG CONSTRUCTION - January 1979 - The logs were brought in by two flat bed trucks from Moscow, Idaho. They were unloaded on the main terrace, and retrieved by crane to the construction site above, as the cabin continued to be reassembled. |